Change control
Change control covers ISO 9001 Clause 6.3 (planning of changes) and 8.5.6 (control of changes): carrying out changes in a planned way and reviewing them, so nothing changes without review.
Request a change
Section titled “Request a change”In Change control, raise a change request with a title and an optional code. Set the type of change (process, product, document, supplier, system, or other), a risk level (low, medium, or high), who requested it, and a target date. Record the reason for the change and what is changing.
Work the lifecycle
Section titled “Work the lifecycle”Each change request moves through a controlled lifecycle:
Requested → Assessing → Approved / Rejected → Implementing → Verified → Closed
The Assessing stage is your impact assessment; Approved or Rejected is the review decision; and Verified confirms the change did what it was meant to after implementation. You can advance changes one at a time, set status in bulk across several, and save filtered views.
What the dashboard watches
Section titled “What the dashboard watches”The Quality dashboard surfaces Awaiting approval (requests still in Requested or Assessing) and High-risk open changes, the two the person running change control checks first.
Next steps
Section titled “Next steps”- Documented information: pair document changes with your controlled documents.
- Evidence: attach the approval and verification records for each change.